STEEL TOWER
The installation of radar scanner and parabola antenna for the multiplex communication link
will require the erection of steel towers. The towers are designed based on the following
considerations.
1) The tower design is based on the standard steel angles so that construction could be
undertaken by local construction companies.
2) The height of the tower is designed to satisfy the required elevation of the radar
scanner and parabola antenna to ensure maximum performance. .
3) Tower foundation design will be considered that the tower can be constructed inside
the available space.
4) The foundation of the tower is designed based on the soil conditions at site. If the
pile foundation is necessary, the pile material will be considered as the one which can
be easily and economically obtained in local such as PC piles.
PLAN PROCEDURE
I.
GENERAL
II.
ERECTION
PROCEDURE
1. Fabricated Materials Handling &
Storage
2. Re-Survey
3. Grain Raising ( Chipping )
4. Erection Works
4.1.
Transporting
of Structural Steel Members
4.2.
Hoisting
4.3.
Alignment
and Leveling
4.4.
Bolting
4.5.
Non
Shrink Grout
5.
Inspection
6.
Painting
7.
Safety
Measurement
I.
GENERAL
1. Safety of works is always the
priority throughout the execution of the execution of the work.
2. The work shall be preformed in accordance with this
documents, structural drawings, plot plan and other documents prepared by
Engineer / Consultant.
3. All structural member shall be
delivered to designated storage area locate beside the erection area.
4. Hoist and transport of the equipment
shall be carried out by the skilled workers having sufficient experience rigging and rope – knotting work
in compliance with safety regulations.
Mantapp !!!!
ReplyDeleteSekarang bukan Danu hau hau lagi tapi ku juluki bapak sebagai danu smart...
Bisa buat referensi nih pak...
Teruskanlah..Teruskanlah....
okreeee tengkyu
Deleteyessssssssssssssss
ReplyDelete